Regulator/Spillway gates at Chute-Allard Power Plant – COH and Hydro-Québec
Looking for solutions?
Contact us
Location
La Tuque, Quebec, Canada
Year of realization
2008 - 2009
Project value
USD 20 Million
DESCRIPTION
Central Chute-Allard is a hydroelectric power plant and a dam built on the Saint-Maurice River by Hydro-Quebec, near Wemotaci in the administrative region of Mauricie, Quebec. This plant, with an installed capacity of 62 MW, and Rapides-des-Coeurs, located downstream, was commissioned in 2008. The construction was completed in 2009.
PROGESYS offered services for design and supervision activities, regarding the spillway/regulator gates, the embedded parts, the hydraulic hoist and the support structure.
SERVICES OFFERED
- Provided design and calculations
- Provided detailed engineering and drawings
- Redacted fabrication and installation procedures
- Supervised fabrication and installation.